Biomass Plants
The renewable energy produced with biomass has an enormous developing potential in Spain (the second Country in the European Union in terms of wooded lands) and Worldwide.
It is one of the most stable and manageable of all the renewable energies, since it does not depend upon unpredictable environmental factors as much as other sources do.
Corporative video
Its use provides several benefits such as reduction of Co2 emissions, new employment opportunities in the rural areas and reduction of forest fire.
Biomass plants are one of our most featured products, especially in their form of turnkey projects, which offer our clients great budget advantages since we take care of the whole process, from
design coordination, materials collection and construction, to the following installation and start-up of the boiler and auxiliary equipment.
Our steam boilers offer avant-garde technology with guarantee of excellent operational functioning.
2012 | Comasa Lautaro II
Biomass Boiler of 20 MWe in Lautaro, Cautín (Chile) commissioned by COMASA GENERACIÓN.
It has been our first international project and represented the beginning of a new Internationalization phase.
The development of this project has involved:
- Basic and detailed engineering.
- Materials and equipment collection.
- Pre-construction in modules suitable for being exported.
- Monitoring and support for the assembly of the steam boiler and the installation of the auxiliary equipment.
- Monitoring and assistance for the start-up and testing execution.
| DATASHEET | |
|
Type of Project: |
Construction and supply |
| Location: | Cautín (Chile) |
|
Date: |
2012 |
|
Steam production: |
71 T/h |
|
Steam pressure: |
92 bar |
|
Steam temperature: |
522ºC |
|
Fuel: |
Mixed |
|
Electricity Generation: |
20MWe |
2012 | Ence Sener Mérida
Biomass Boiler of 20 MWe in Mérida (Spain) commissioned by SENER-ENCE.
This power plant exclusively uses woods derived from fuel crops propriety of Ence, Company leader in Europe in the production of cellulose from eucalyptus, and first Spanish Company producing renewable energy with forest-origin biomass.
The expected annual production is 160 million kWh/year, enough to supply electricity to about 70,000 people.
The development of this project has involved:
- Basic and detailed engineering.
- Materials and equipment collection.
- Construction and installation of the boiler and ancillaries, as well as of the equipment supporting. structure, access and cover.
- Start-up and testing.
- Workers training to operate and maintain the plant.
| DATASHEET | |
| Type of project: | Turnkey |
|
Location: |
Mérida (Spain) |
|
Date: |
2012 |
|
Steam production: |
73,5 T/h |
|
Steam Pressure: |
102 bar |
|
Steam Temperature: |
485ºC |
|
Fuel: |
Poplar and eucalyptus wood |
|
Electricity Generation: |
20MWe |
First tests video.
2009 | Acciona Energía Miajadas
The first European mixed biomass boiler, 16 MWe, located in Cáceres (Spain) and commissioned by Acciona Energía.
The development of this project has involved:
- Basic and detailed engineering.
- Materials and equipment collection.
- Construction of the boiler and auxiliary equipment, as well as the supporting structure for the equipment and access.
- Start-up and testing.
- Workers training to operate and maintain the plant.
Moreover, we provided the design engineering, supply, assembly and start-up of the biomass conveyor and supply systems, combustion system with vibrating grate with high speed secondary air supply, and gas filter with fly ash collection.
| DATASHEET | |
| Type of project: | Turnkey |
|
Location: |
Cáceres (Spain) |
|
Date: |
2009 |
|
Steam Production: |
71 T/h |
|
Steam Pressure: |
92 bar |
|
Steam Temperature: |
522ºC |
|
Fuel: |
Cereal straw and wood waste |
|
Electricity Generation: |
16MWe |
2008 | Acciona Energía Briviesca
Biomass boiler of 16 MWe commissioned by ACCIONA ENERGÍA.
The development of this project has involved:
- Basic and detailed engineering.
- Materials and equipment collection.
- Construction and start-up of the boiler and auxiliary equipment, as well as the supporting structure for equipment and access.
- Start-up and testing.
- Workers training for plant operations and maintenance.
Moreover, we provided design engineering, supply, assembly and start-up of the biomass conveyor and supply system, running with two types of fuel, combustion system with vibrating grate with high speed secondary air supply, and gas filter with fly ash collection.
| DATASHEET | |
| Type of project: | Turnkey |
|
Location: |
Burgos (Spain) |
|
Date: |
2008 |
|
Steam Production: |
71 T/h |
|
Steam Pressure: |
92 bar |
|
Steam Temperature: |
522ºC |
|
Fuel: |
Cereal straw |
|
Electricity generation: |
16MWe |
2002 | Finaltair Energía. Albuixech
Water-tube boiler for the disposal of wood waste generated by local forestry companies.
The plant, managed by Finaltair Energía S.A., went into operation in 2003.
| FICHA | |
| Type of project: | Turnkey |
|
Location: |
Valencia (Spain) |
|
Fecha: |
2002 |
|
Date: |
25 T/h |
|
Steam generation: |
41 bar |
|
Steam pressure: |
400ºC |
|
Fuel: |
Wood waste |
|
Electricity Generation: |
-- |
1988 | Puertas Norma. San Leonardo de Yagüe
The first biomass plant developed by Termisa Energía, S.A., commissioned by Puertas Norma and pioneer to generate energy using its own resources.
| DATASHEET | |
| Type of project: | Turnkey |
|
Location: |
Soria (Spain) |
|
Date: |
1988 |
|
Steam generation: |
14 T/h |
|
Steam pressure: |
8 bar |
|
Steam temperature: |
175ºC |
|
Fuel: |
Wood waste |
|
Electricity Generation: |
-- |
Share this page